A twenty-four month project to enhance the fire precautions throughout the hospital required careful planning and implementation. Performed on a ward-by-ward basis, the hospital remained in complete operation throughout the installation of a new multiple-panel networked fire alarm system with graphics package. Integration of eighty-six other non-fire systems was also a requirement of the graphics package.